12ft (3M90) modular Mobile wind tunnel Specifications
You need place to fly a no need for a building... The new 12 foot ( 3m90) mobile uses our unique modular vertical wind tunnel design that ensures power and clean airflow. There are no other wind tunnels like this on the market.
Our products are second two none in terms of offering a "real" skydiving experience and the best way to prove this is to fly...
Our products are second two none in terms of offering a "real" skydiving experience and the best way to prove this is to fly...
|
Conformity
|
Conform with CEE: mandatory to run the wind tunnel in Europe
|
|
Airflow
|
High grade airflow with our special design and settler room
|
|
Air speed
|
Over 270 km/h
|
|
Structure
|
Steel, stainless steel, glass & clear ploy-carbonate flight zone
|
|
Power plants
|
6 diesel Scania CEE certified engines 6x330kw
|
|
Propellers
|
6 propellers with interchangeable blades
|
|
Air-stream dimensions
|
12 foot / 3m80 meters at the bottom to 4,2 meters at the top
9,2 meters high |
|
Noise levels
|
under 80db* depending on residual noise at 10 meters
|
|
Fuel tanks
|
CEE certified for road transport
|
|
Fuel consumption
|
60 to 90 liters per hour
|
|
Operation time with full tank
|
Over 23 hours depending on speeds used
|
Transport of the mobile vertical wind tunnel
|
Dimensions in transport configuration
|
6 trucks are needed
|
|
Weight
|
40 tonnes (with out a trailer)
|
|
Road transport
|
Suitable for road transport on European roads with adequate trailer and truck.
|
Staff needed
This mobile vertical wind tunnel is very adaptable to your clients, from 10 clients to 150 clients our wind tunnel can handel it and it is very easy to train staff to make it work.
|
Assembly / disassembly
|
3 to 8 people
|
|
Minimum operation staff
|
1 secretary
1 operator 1 to 2 instructors |
|
Training
|
Staff training last 4 days
The staff must have necessary National diplomas to train in a wind tunnel |